Little Burro Project Demo and walls


Our little burro project is well under way. We have gutted the inside removing all the insulation plywood and bookshelf that was there to start with.

We have put down a layer of poly as a moisture barrier on the floor and covered that with cork underlay ready for our floating FSC-certified floor. We are using Ultratouch insulation and then covering that with Green-E board for the walls. It is coming along very nicely. We are excited to get started on the finishes as they are the really fun parts.
We are well into the design stage and have started to gather all the materials we will need to create our little room.



Truck with Cork underlay. Before walls and shelving have been removed.



After all the old insulation, walls and shelving are out ready for all the great product we are going to use